Install and (dis)assemble
After the product has been intensively tested during the Factory Acceptance Test (FAT), it is transferred to the user site. The equipment is connected to the existing structures and utilities. This includes anchoring static tanks or installing piping and field cabling.
Disassembly and assembly
Are you replacing your existing process equipment with new machines from Veenbrink RVS? In that case, we can remove the existing equipment and install the new equipment. The starting point is always to prefabricate and assemble the new process equipment as plug-and-play as possible, taking into account the available space and passages at your location.